SCG_Fenris_Wolf Posted October 23, 2020 Posted October 23, 2020 1 hour ago, chiliwili69 said: New AMD CPUs still have to demonstrate they are better in single threaded performance. In the previous generation Intel was better: https://docs.google.com/spreadsheets/d/1gJmnz_nVxI6_dG_UYNCCpZVK2-f8NBy-y1gia77Hu_k That is true. We know YouTube hypes these and tells you something different, but remember: Only believe hard, actual facts. I am hoping the new AMD top-of-the-line can finally compete in single core performance - under avx instructions and with a steady, *never throttling once*, boost. But I'm not getting my hopes up, not a horse I'd bet on.
robbiec Posted October 26, 2020 Posted October 26, 2020 I wanna know what sort of cooling you're using to keep your chip at 5+Ghz constant with an AVX offset of 0 But you're right, we don't know if the new Ryzen's can hold 4.8+ indefinitely on a single thread, iirc they shuffle to keep thermals in check on that core. Then again doesn't Intel have a 56sec lock on max boost?
dburne Posted October 26, 2020 Posted October 26, 2020 32 minutes ago, robbiec said: I wanna know what sort of cooling you're using to keep your chip at 5+Ghz constant with an AVX offset of 0 But you're right, we don't know if the new Ryzen's can hold 4.8+ indefinitely on a single thread, iirc they shuffle to keep thermals in check on that core. Then again doesn't Intel have a 56sec lock on max boost? I have my 9900k running 5.2 GHz on all 8 cores with 0 AVX offset, using a Corsair H150i Pro AIO cooler.
Alonzo Posted October 26, 2020 Posted October 26, 2020 2 hours ago, robbiec said: I wanna know what sort of cooling you're using to keep your chip at 5+Ghz constant with an AVX offset of 0 But you're right, we don't know if the new Ryzen's can hold 4.8+ indefinitely on a single thread, iirc they shuffle to keep thermals in check on that core. Then again doesn't Intel have a 56sec lock on max boost? Not if you know the motherboard BIOS. Just set the limits really high and the chip stays at max boost max power draw. My chip is an 8086K @ 5.1ghz, hyper-threading off, something like 1.38v CPU vcore, RAM at 3800mhz 1.4v. The CPU is cooled by a fairly modest Noctua air cooler, the NH-U14S (needed a smaller one for RAM compatibility). My secret is that I delidded the CPU and replaced the crappy thermal paste with liquid metal, which got be about a 15C temperature reduction. But yeah. Get a 9000 or 10000-series Intel with the soldered TIM and a 240/280/360mm AIO and you'll be fine at 5.0 or 5.1ghz.
BlueHeron Posted October 26, 2020 Posted October 26, 2020 2 hours ago, robbiec said: I wanna know what sort of cooling you're using to keep your chip at 5+Ghz constant with an AVX offset of 0 Noctua NH-D15S
wheeliemonsta Posted October 28, 2020 Posted October 28, 2020 Reverb G2 starting to ship soon according to HP rep on r/HPReverb. Final production units are on their way. Looks like they're remaining fairly close to the recently announced timeline of early/mid November for the first batch of pre-orders. Exciting times!
SCG_Fenris_Wolf Posted October 28, 2020 Posted October 28, 2020 Is anyone volunteering to get a Zen3 5800X so we can benchmark it against the Intel line-up in IL-2? 1
HunDread Posted October 28, 2020 Posted October 28, 2020 2 hours ago, SCG_Fenris_Wolf said: Is anyone volunteering to get a Zen3 5800X so we can benchmark it against the Intel line-up in IL-2? Sure feel free to send me one and I'll sacrifice myself for the community 3
robbiec Posted October 28, 2020 Posted October 28, 2020 9 hours ago, SCG_Fenris_Wolf said: Is anyone volunteering to get a Zen3 5800X so we can benchmark it against the Intel line-up in IL-2? I'm thinking 5900x next week if that'll do? 1
SCG_Fenris_Wolf Posted October 29, 2020 Posted October 29, 2020 1 hour ago, robbiec said: I'm thinking 5900x next week if that'll do? That'll do
Japsai Posted October 30, 2020 Posted October 30, 2020 Sorry if the answer is buried in previous pages, but what PC spec is likely to be necessary for decent performance in IL2 GB and Reverb G2. I run a PC with CPU: Intel(R) Core(TM) i7-8700 CPU @ 3.20GHz GPU: GeForce RTX 2070 Memory: 16 GB RAM (15.88 GB RAM usable) SSD+HDD Would you purchase a Reverb G2 in confidence with this spec? Or would I be better with the Rift S (until I have upgraded my PC in a few years). Grateful for thoughts/comments
Alonzo Posted October 30, 2020 Posted October 30, 2020 5 hours ago, 334th_Biffa said: Sorry if the answer is buried in previous pages, but what PC spec is likely to be necessary for decent performance in IL2 GB and Reverb G2. I run a PC with CPU: Intel(R) Core(TM) i7-8700 CPU @ 3.20GHz GPU: GeForce RTX 2070 Memory: 16 GB RAM (15.88 GB RAM usable) SSD+HDD Would you purchase a Reverb G2 in confidence with this spec? Or would I be better with the Rift S (until I have upgraded my PC in a few years). The problem with the 8700 (non-K) chip is that it's a bit too slow for good VR frame rates. You need to hit 90 FPS for the Reverb G2, 80 FPS for the Rift S (and Valve Index). You're also a little too slow with the RTX 2070, even for the Rift S, and definitely too slow for the G2. RAM speed is also a factor, you want at least 3200 Mhz or better. With your current setup I think you can reliably hit half-framerate mode, (40 FPS doubled to 80, or 45 doubled to 90). With the frame doubling mode you're going to see "ghosting" on planes that are moving rapidly past your field of view, such as in a dogfight. For some players they don't mind the ghosting, for some players (like me) they can't stand it. So I reduce my settings a lot in order to try to hit the full frame rate. You might be able to buy or borrow a Rift S to test it out on your rig. If you don't like the frame doubling mode, you can return it (depends on the retailer -- check their policy). I would 100% recommend VR but for IL2 (and the other flight sim) you need a very powerful rig to hit full frame rate. I was playing the other sim at 60 FPS doubled to 120, though, and it looked fine to me. The ghosting is more of a factor for up-close WW2 knife fights. 1
chiliwili69 Posted October 31, 2020 Posted October 31, 2020 23 hours ago, 334th_Biffa said: i7-8700 CPU @ 3.20GHz 3.2GHz is the base clock, but if you activate the TurboBoost option at BIOS you could run at 4.6GHz which is much better, but still maybe not enough for full 80 or 90 fps (depending on settings). To mantain the 4.6 GHz you will need to mantain the CPU temp below certain limit. What CPU cooler do you have? You can consider to buy a 8700K (2nd hand o perhaps new) or 9700K. And resell your 8700. This is what I did when I upgraded from my old 4790 to my current 4790K. You need to know also what is your RAM speed. Install CPU-Z an provide a screenshoot of the memory tab. For GPU your 2070 would be quite OK for RiftS and similar devices. For Higher res devices you should upgrade. The beauty thing is that we have plently of new options for GPU at very good prices. 1
JimmySolarium_VR Posted November 3, 2020 Posted November 3, 2020 Update on the Shipping situation through bestware / Germany: 3 1
[CPT]Crunch Posted November 4, 2020 Posted November 4, 2020 (edited) So VR is dead, eh, just a passing fad. Think HP just marked the consensus wrong, people will shell out in a big way in numbers, but the hardware has to be good. Edited November 4, 2020 by [CPT]Crunch
SR-F_Winger Posted November 4, 2020 Posted November 4, 2020 Preordered 06th of July. So first batch baby. YES! 1
LLv34_Temuri Posted November 4, 2020 Posted November 4, 2020 On 10/28/2020 at 3:46 PM, SCG_Fenris_Wolf said: Is anyone volunteering to get a Zen3 5800X so we can benchmark it against the Intel line-up in IL-2? @LLv34_Flanker What was the rig you're going to build? 1
41Sqn_Skipper Posted November 4, 2020 Posted November 4, 2020 Is there a dummie's guide to configure and use the Reverb with IL2 (assuming the G1 and G2 will be similar)? Written for someone without any VR background at all.
HunDread Posted November 4, 2020 Posted November 4, 2020 1 hour ago, 41Sqn_Skipper said: Is there a dummie's guide to configure and use the Reverb with IL2 (assuming the G1 and G2 will be similar)? Written for someone without any VR background at all. @SCG_Fenris_Wolf has a WMR/G1 section in his help page here: 1
Pinello Posted November 7, 2020 Posted November 7, 2020 (edited) The british guy: https://www.youtube.com/watch?v=Q0nP8bbggGw https://www.youtube.com/watch?v=5_z0hGEhOs8 Edited November 7, 2020 by Pinello . 1
HunDread Posted November 10, 2020 Posted November 10, 2020 I just got an e-mail from bestware. It seems there is a one week delay compared to the information above. The first batch will reach them next week which is week 47 instead of week 46 which would be this week.
FTC_Mephisto Posted November 10, 2020 Posted November 10, 2020 To be fair their reddit page is more transparent then 99% of the 3080 / 3090 retailers keeping their customers in the dark... https://www.reddit.com/r/bestware/comments/jn8cjk/supply_update_on_hp_reverb_g2_preorders/ On 11/7/2020 at 10:39 AM, Pinello said: The british guy: https://www.youtube.com/watch?v=Q0nP8bbggGw https://www.youtube.com/watch?v=5_z0hGEhOs8 Is HP paying this guy? Hope not and G2 is indeed so good...
HunDread Posted November 10, 2020 Posted November 10, 2020 37 minutes ago, ACG_Mephisto said: To be fair their reddit page is more transparent then 99% of the 3080 / 3090 retailers keeping their customers in the dark... https://www.reddit.com/r/bestware/comments/jn8cjk/supply_update_on_hp_reverb_g2_preorders/ That's right. I'm not complaining. One week sooner or later is not really an issue. And it's not in their control.
dburne Posted November 10, 2020 Posted November 10, 2020 1 hour ago, ACG_Mephisto said: To be fair their reddit page is more transparent then 99% of the 3080 / 3090 retailers keeping their customers in the dark... https://www.reddit.com/r/bestware/comments/jn8cjk/supply_update_on_hp_reverb_g2_preorders/ Is HP paying this guy? Hope not and G2 is indeed so good... Yeah that is looking pretty good, hope so.
SR-F_Winger Posted November 12, 2020 Posted November 12, 2020 (edited) On 11/10/2020 at 2:42 PM, HunDread said: I just got an e-mail from bestware. It seems there is a one week delay compared to the information above. The first batch will reach them next week which is week 47 instead of week 46 which would be this week. I preordered luckily early enough to be one of the happy 13% next week. Cant wait thou. Edited November 12, 2020 by Winger
HunDread Posted November 12, 2020 Posted November 12, 2020 21 minutes ago, Winger said: I preordered luckily early enough to be one of the happy 13% next week. Cant wait thou. Yea me too. July 7 here. 1
dburne Posted November 12, 2020 Posted November 12, 2020 Beginning to look like those of us in the states are going to be bringing up the rear on this one.
HunDread Posted November 12, 2020 Posted November 12, 2020 10 minutes ago, dburne said: Beginning to look like those of us in the states are going to be bringing up the rear on this one. I believe this 13 % is just for this one retailer. Others may be able to send out more of their orders with their 1st batch.
dburne Posted November 12, 2020 Posted November 12, 2020 Noticed this morning a pending charge on my credit card account for the Reverb G2. Logged onto Connection and it has a tracking numbers, says pending shipment. UPS 2nd day air, so maybe I will get either Sat. or Mon. 2 2
Guest deleted@134347 Posted November 12, 2020 Posted November 12, 2020 1 hour ago, dburne said: Noticed this morning a pending charge on my credit card account for the Reverb G2. Logged onto Connection and it has a tracking numbers, says pending shipment. UPS 2nd day air, so maybe I will get either Sat. or Mon. if you don't mind me asking when did you pre-order? mine was in July and the status is "backordered".
dburne Posted November 12, 2020 Posted November 12, 2020 29 minutes ago, 69th_Didney_World said: if you don't mind me asking when did you pre-order? mine was in July and the status is "backordered". July 8th. Woot - just checked again mine now shows shipped, with estimated delivery tomorrow! Hope that holds true, will be able to devote the weekend to it. 1 1
Guest deleted@134347 Posted November 12, 2020 Posted November 12, 2020 8 minutes ago, dburne said: July 8th. Woot - just checked again mine now shows shipped, with estimated delivery tomorrow! Hope that holds true, will be able to devote the weekend to it. cool, mine was 5 days later on the 13th.. congrats!
dburne Posted November 12, 2020 Posted November 12, 2020 (edited) 3 minutes ago, 69th_Didney_World said: cool, mine was 5 days later on the 13th.. congrats! Thanks. Going to be interesting, see how much faffing about with WMR I will have to do. The question I will be curious about, is whether I will want to officially retire the Rift S or not. The answer to that will probably depend on the controller tracking on the Reverb G2. One thing I have always loved about my Rift S, is no muss no fuss at all, just plug in and play. Edited November 12, 2020 by dburne
unlikely_spider Posted November 12, 2020 Posted November 12, 2020 Huh. How about that. Tracking says mine should arrive tomorrow. I had no idea.
Blitzen Posted November 12, 2020 Posted November 12, 2020 (edited) Has anyone got their pre-ordered sets yet & had time to do some initial flying?? I pre-ordered a little late & am not due to receive mine until early December.I'm not aware of a way to check out if and when mine might ship.Can someone explain how I can do this.So far even checking in with the Reverb site I haven't had any luck- alille help would be appreciated,? Edited November 12, 2020 by Blitzen wording
Stolle Posted November 12, 2020 Posted November 12, 2020 I ordered on May 29 status shows backordered.
Ribbon Posted November 13, 2020 Posted November 13, 2020 I preordered from bestware on October 12th so i have plenty of time to upgrade my pc and get rtx3080 ?
Blitzen Posted November 13, 2020 Posted November 13, 2020 I just got the word : Mine is due in December...apparently I was just over the deadline for November delivery.Maybe by that time new gamecards will become more available?
dburne Posted November 13, 2020 Posted November 13, 2020 36 minutes ago, Blitzen said: I just got the word : Mine is due in December...apparently I was just over the deadline for November delivery.Maybe by that time new gamecards will become more available? You should be able to get some good info on the Radeon cards releasing later this month. Should be heavy contendors.
Blitzen Posted November 13, 2020 Posted November 13, 2020 (edited) 6 minutes ago, dburne said: You should be able to get some good info on the Radeon cards releasing later this month. Should be heavy contendors. One hopes ...I sent an inquiry to them directly about news on the RX6800XT , but as of today no answer back...sigh...: This is an automatically generated email, please do not reply. Dear Customer, Your Service Request has been received and will be processed shortly. Depending on the nature of your inquiry, further automated messages with additional instructions might follow. Service Request: {ticketno:[8201022034]} We thank you for your patience. Best regards, AMD Global Customer Care Edited November 13, 2020 by Blitzen
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now